2014 11 20 Region-wide Scheduled Power Out Results

BC Hydro scheduled a power out for 2PM to 3PM, November 20, from Telkwa to Kitwanga to repair some vandalism. They kept to that schedule almost to the minute. Great job, BC Hydro!

I fired up my generator at 1 PM and connected to it all the devices in my server room. Turns out there are two small-capacity UPSes that need to be replaced, which I will do shortly. Other than that a few minutes for the community server, there was no downtime at all during this power out.

Main power returned at 3PM. I waited until 4PM to move everything back to main power.

All in all, I’m happy with the results of this scheduled power out.


Dennis Strain
Enclave Managed Networks
Box 365, Smithers, BC, Canada V0J 2N0

dstrain@bcenclave.ca
877-877-8793 toll free phone & fax

Always Choose Peace
Always Choose Kindness
Always Choose Compassion

About admin

System & network administrator
Enclave Managed Systems

This entry was posted in News, Reports. Bookmark the permalink.

Leave a Reply